Your IP: 34.204.191.31 United States Near: Houston, Texas, United States

Lookup IP Information

Previous 1 2 3 4 5 6 7 8 Next

Below is the list of all allocated IP address in 139.145.0.0 - 139.145.255.255 network range, sorted by latency.

This article is about the Ares V launch vehicle. For other uses, see Ares (disambiguation). Ares V Artist's impression of an Ares V during SRB separation Function Cargo Launch Vehicle (unmanned) Manufacturer TBD (stage I) TBD (stage II) Country of origin United States Size Height 116 m (381 ft) or 109 m (358 ft) Diameter 10 m (33 ft) or 8.4 m (28 ft) Stages 2 Capacity Payload to LEO 188,000 kg (410,000 lb)[1] Payload to TLI 71,100 kg (157,000 lb) or 60,600 kg (134,000 lb) Launch history Status Canceled Launch sites Kennedy Space Center, LC-39A Total launches 0 Boosters (Stage 0) - 5- or 5.5-segment Shuttle-derived SRB No. boosters 2 Engines 1 solid Thrust TBC Burn time TBC Fuel APCP (solid) First stage Engines 5 or 6 RS-68B[2] or 5 SSME Thrust TBC Burn time TBC Fuel LH2/LOX Second stage - Earth Departure Stage Engines 1 or 2 J-2X Thrust Burn time Fuel LH2/LOX The Ares V (formerly known as the Cargo Launch Vehicle or CaLV) was the planned cargo launch component of the Constellation program, which was to have replaced the Space Shuttle after its retirement in 2011. Ares V and the smaller Ares I were named after Ares, the Greek god of war, which is the equivalent to the Roman god Mars. Initially, the Ares V would have launched the Earth Departure Stage and Altair lunar lander had NASA returned to the Moon, which was planned for 2019, but would also have served as the principal launcher for missions beyond the Earth-Moon system, including the program's ultimate goal, a manned mission to Mars after 2030.[3] The unmanned Ares V would complement the smaller, and human-rated Ares I rocket for the launching of the 4-6 person Orion spacecraft. Both rockets, deemed safer than the current Space Shuttle, would have utilized technologies developed for the Apollo program, the Shuttle, and the Delta IV EELV programs.[4] However, the Constellation program, including Ares V was canceled in October 2010 by the passage of the 2010 NASA authorization bill. Contents 1 Development 1.1 Early concepts 1.2 Constellation 1.3 Further roles 1.4 Cancellation 2 Design 3 Derivatives 3.1 Ares IV 3.2 Ares V Lite 4 See also 5 References 6 External links Development Early concepts In the 1997 book The Case for Mars, Robert Zubrin discussed a possible future heavy launch vehicle named Ares.[5] In the book the rocket would have consisted of the Space Shuttle's External Tank powered by four SSMEs and a second stage powered by an RL-10 engine. One notable difference in the Zubrin et al. design is the mounting location of the SSMEs, which were side-mounted on a small flyback craft. This design was meant to allow the Ares to fly using existing Space Shuttle infrastructure.[citation needed] Constellation Artist's impression of the Ares V at liftoff Ares V was to be the cargo launch component of the Constellation program. Unlike the Saturn V and Space Shuttle, where the crew and cargo were launched together on the same rocket, Project Constellation was planned to use two separate launch vehicles, the Ares I and the Ares V, for crew and cargo respectively. This configuration would have allowed the two launch vehicles to be optimized for their respective missions. Constellation therefore combined the Lunar Orbit Rendezvous used by Apollo with the Earth Orbit Rendezvous mode proposed by Dr. Wernher von Braun (along with the "Direct Ascent" proposal) during the early planning stage of Apollo. Development of the rocket and its Earth departure stage was led by Marshall Space Flight Center. Ames Research Center was responsible for the Ares V integrated health management system supports in developing its payload shroud. Glenn Research Center led the development of the lunar lander ascent stage as well as Ares V power system, thrust vector control system and payload shroud. Langley Research Center had a lead role on Ares V aerodynamics.[6] In 2007 NASA announced that Alliant Techsystems will be the contractor for the SRBs of both Ares I and Ares V.[7] Further roles Although the Ares V was a medium to long term project, NASA planned to deploy its lift capability in a range of projects,[8] along the lines of the former Apollo Applications Program. One proposal was to build an 8 to 16-meter Advanced Technology Large-Aperture Space Telescope[9] to be placed in the Sun/Earth L2 point. It would be a significant increase in dimension and performance over the Hubble Space Telescope and the Ares V vehicle was expected to carry this to its destination in a single launch.[citation needed] Future Ares V missions could also have served as a cost-effective, mass transport of construction materials for future spacecraft and missions, delivering raw materials for example to a Moon dock.[citation needed] In May 2010 NASA planned flight demonstrations of Ares V hardware along with Ares I hardware after the scheduled upcoming Ares I-X Prime test of the Ares I 5-segment SRB first stage. Several flights were listed as "Heavy Lift" test flights for testing the first stage of the Ares V simultaneously with the Ares I upper stage attached on top of the Ares V first stage. This would save both time and money in avoiding the gap between testing Ares I and Ares V hardware with current limited funding.[10] Cancellation The Augustine Commission concluded that "Under the FY 2010 funding profile, the Committee estimates that Ares V will not be available until the late 2020s".[11] Even if NASA had been given the $3 billion increase and the ISS had been retired in 2015, the committee still believed that the Ares V would not be ready till the mid-2020s.[12] On February 1, 2010, President Barack Obama announced a proposal to cancel the Constellation program effective with the U.S. 2011 fiscal year budget,[13] but later announced changes to the proposal in a major space policy speech at Kennedy Space Center on April 15, 2010. In October 2010, the NASA authorization bill for 2010 was signed into law, which canceled Constellation.[14] But previous legislation keeps Constellation contracts in force until a new funding bill is passed for 2011.[15][16] Design Exploded view of the Ares V including Earth Departure Stage. The first stage is shown in white, Second stage in orange-brown, and upper stage checkered. The Ares V was intended as a heavy-launch vehicle to send large hardware and materials to the Moon, or to send supplies beyond Earth orbit to sustain human presence there.[2] The Ares V was designed to be a three-stage rocket: the first and second stages, which burn together, were to utilize both solid and liquid propulsion with the upper stage providing the necessary propulsion to send the hardware and staples beyond low-Earth orbit and onto a trajectory to the Moon. Ares V in heavy preliminary design review after the results of the 2009 Augustine Commission.[17] Like the Space Shuttle, the Ares vehicle was to utilize a pair of solid-fueled first stage rocket boosters that burn simultaneously with the liquid-fueled second (core) stage. The solid rocket booster on Ares V was envisioned as an improved version of the current Space Shuttle Solid Rocket Booster, but with five or five and a half segments instead of the current four segments.[2][18][19] The liquid-fueled second stage was derived from the Space Shuttle External Tank, and was to use either five or six RS-68B engines attached to the bottom of a new 10 m tank, or five SSMEs attached to the bottom of a stretched version of the Space Shuttle's 8.4 m tank.[20] In either configuration, it was designed to be fueled by liquid oxygen (LOX) and liquid hydrogen (LH2). Comparison of Saturn V, Space Shuttle, Ares I, Ares IV and Ares V The upper stage, derived from the S-IVB upper stage used on the Saturn IB and Saturn V rockets, was named the Earth Departure Stage (EDS). The EDS would be powered by the Apollo-derived J-2X rocket engine, which was also proposed to be used on the liquid-fueled upper stage of the Ares I booster. The EDS was to be used to steer the Altair lunar lander into its initial low-Earth "parking" orbit for later retrieval by the Orion spacecraft, and then would propel both the Altair and Orion to the Moon.[2] The EDS could also have been used to haul large payloads into low-Earth orbit, along with placing large unmanned spacecraft onto trajectories beyond the Earth-Moon system. The Ares V was designed to have a payload capacity of over 414,000 lb (188 metric tons) to Low Earth orbit (LEO), and 157,000 lb (71 metric tons) to the Moon.[2] Upon completion the Ares V would be the most powerful rocket ever built, lifting more into orbit than even the American Saturn V, the failed Soviet N-1 for the canceled Soviet Moonshot, and the successful Soviet/Russian Energia booster developed for the Buran Shuttle.[21] Besides its lunar role,[2] it could also support a manned Orion expedition to a Near-Earth asteroid, and could boost an 8 to 16-meter successor of the Hubble Space Telescope to the Sun-Earth L2 point. Derivatives Ares IV The Ares IV concept combines an Ares I upper stage with an Ares V first stage.[22] Specifically, the vehicle would consist of the liquid-fueled core stage from the Ares V design, two five-segment solid rocket boosters, and the liquid-fueled upper stage from the Ares I, as described by NASA in January 2007. The Ares IV would be a combined 113 m (371 ft) tall and could be used to reach the Moon.[23] Total payload capacity would be 41,100 kg (90,610 lb) to 240 miles (386 km) for direct trans-lunar injection.[citation needed] NASA was considered using Ares IV to evaluate high-speed "skip" reentry profiles of the Orion capsule in 2007.[24] NASA had planned flight demonstrations of Ares I and Ares V hardware in "Heavy Lift" configurations from 2013. The "Heavy Lift" test flights were to test the first stage of the Ares V simultaneously with the Ares I upper stage attached on top to save both time and money. The later Heavy Lift test vehicle configurations are similar to the Ares IV vehicle.[25] Ares V Lite Ares V Lite was an alternative launch vehicle for NASA's Constellation program suggested by the Augustine Commission. Ares V Lite was a scaled down Ares V.[26][27] It would have used five RS-68 engines and two five-segment SRBs and have had a low Earth orbit payload of approximately 140 metric tons (309,000 lb).[28] If chosen, Ares V Lite would have replaced the Ares V and Ares I launchers. One Ares V Lite version would have been a cargo lifter like Ares V and the second version would have carry astronauts in the Orion spacecraft.[28] See also Comparison of super heavy lift launch systems Shuttle-Derived Launch Vehicle Shuttle-Derived Heavy Lift Launch Vehicle Direct Launch Vehicle References ^ HSF Final Report: Seeking a Human Spaceflight Program Worthy of a Great Nation, October 2009, Review of U.S. Human Spaceflight Plans Committee, p. 65-66. ^ a b c d e f Overview: Ares V Cargo Launch Vehicle. NASA. Retrieved 30 September 2008. ^ Handlin, Daniel (2006-10-11). "NASA sets Orion 13 for Moon Return". NASA SpaceFlight.com. http://www.nasaspaceflight.com/2006/10/nasa-sets-orion-13-for-moon-return/. Retrieved 2007-01-12.  ^ "NASA - Ares I Crew Launch Vehicle". NASA. 29 April 2009. http://www.nasa.gov/mission_pages/constellation/ares/aresl/index.html. Retrieved 13 May 2009.  ^ Zubrin, Robert & Wagner, Richard. 1997. The Case for Mars. p. 61ss ^ NASA Assigns Field Center Roles for Ares 5, Lunar Lander. SPACE.com ^ NASA Awards First Stage Contract for Ares Rockets ^ "Thinking Big About Space Telescopes". NASA. http://www.nasa.gov/mission_pages/constellation/ares/space_telescopes.html.  ^ "Where Will Astronomy Be In 35 Years?". Astronomy Magazine, August 2008. ^ Bergin, Chris. Ambitious Ares test flight plan proposed for HLV demonstrations. nasaspaceflight.com, May 10, 2010. ^ Augustine Committee 2009, p. 60. ^ Augustine Committee 2009, p. 86. ^ http://www.nasa.gov/pdf/420990main_FY_201_%20Budget_Overview_1_Feb_2010.pdf ^ "President Obama Signs New Vision for U.S. Space Exploration Into Law". Space.com, October 11, 2010. ^ "Constellation Is Dead, But Pieces Live On". Aviation Week, October 26, 2010. ^ "NASA Stuck in Limbo as New Congress Takes Over". Space.com, January 7, 2011. ^ "Bolden Directs MSFC Special Team to evaluate HLV alternatives" ^ "Study reveals a six RS-68 and 5.5 segment booster for Ares V". NASAspaceflight.com. 2008-06-15. http://www.nasaspaceflight.com/2008/06/study-reveals-a-six-rs-68-and-55-segment-booster-for-ares-v/.  ^ "NASA Needs A Bigger Ares V". Aviation Week & Space Technology, February 27, 2008. ^ "Return to SSME – Ares V undergoes evaluation into potential switch". NASAspaceflight.com. 2008-06-15. http://www.nasaspaceflight.com/2008/12/ssme-ares-v-undergoes-evaluation-potential-switch/.  ^ Creech, Steve and Phil Sumrall. "Ares V: Refining a New Heavy Lift Capability". NASA. ^ Berger, Brian (January 26, 2007). "NASA Studies Early Moon Shot for New Space Capsule". Space.com. http://space.com/news/070126_ares_moon.html. Retrieved February 11, 2008.  ^ Rob Coppinger (2 January 2007). "NASA quietly sets up budget for Ares IV lunar crew launch vehicle with 2017 test flight target". Flight International. http://www.flightglobal.com/articles/2007/01/02/211318/nasa-quietly-sets-up-budget-for-ares-iv-lunar-crew-launch-vehicle-with-2017-test-flight.html.  ^ Berger, Brian (January 26, 2007). "NASA Studies Early Moon Shot for New Space Capsule". Space.com. http://space.com/news/070126_ares_moon.html. Retrieved January 26, 2007.  ^ Bergin, Chris. "Ambitious Ares test flight plan proposed for HLV demonstrations". Nasaspaceflight.com, May 10, 2010. ^ Coppinger, Rob. "Will Constellation live on?". Flight International, August 11, 2009. ^ Madrigal, Alexis. "Human Spaceflight Ball in Obama’s Court". Wired, October 22, 2009. ^ a b Augustine Committee 2009, pp. 38, 64-67, 80. Augustine Committee. "Review of U.S. Human Space Flight Plans Committee, Final Report". NASA, October 2009. External links NASA Ares V Cargo Launch Vehicle page Can we power future Mars missions? Inside the Ares Projects - a six-part online video series about the Ares Projects from The Futures Channel NASA Funding Cuts v · d · eConstellation program Launch tests Ares I-X · Ares I-Y · Ares V-Y Later missions List of Constellation missions · Orion Asteroid Mission · Orion Mars Mission Components Orion · Ares I · Ares V · Earth Departure Stage · Altair · J-2X · RS-68 · Shuttle-Derived Launch Vehicle Launch sites Kennedy Space Center · LC-39 Abort Orion abort modes · Orion Abort Test Booster · Launch Abort System (LAS) · Max Launch Abort System (MLAS) Related topics Vision for Space Exploration · Exploration Systems Architecture Study · DIRECT · Constellation Space Suit · Advanced Technology Large-Aperture Space Telescope (AT-LAST) · NASA Authorization Act of 2005 · Augustine Commission List of missions v · d · eUnited States orbital launch systems Active Atlas V · Delta (II · IV) · Falcon 1 · Falcon 9 · Minotaur (I · IV) · Pegasus · Taurus In development Athena (Ic · IIc) · Minotaur V · Taurus II · Falcon Heavy Retired Ares I · Ares V · Athena (I · II) · Atlas (B · D · E/F · G · H · I · II · III · LV-3B · SLV-3 · Able · Agena · Centaur) · Caleb · Conestoga · Delta (A · B · C · D · E · G · J · L · M · N · 0100 · 1000 · 2000 · 3000 · 4000 · 5000 · III) · H-I*  · Juno I · Juno II · N-I* · N-II* · Pilot · Saturn (I · IB · V · INT-21) · Scout · Shuttle · Sparta · Thor (Able · Ablestar · Agena · Burner · Delta · DSV-2U) · Thorad-Agena · Titan (II GLV · IIIA · IIIB · IIIC · IIID · IIIE · 34D · 23G · CT-3 · IV) · Vanguard * - Japanese projects using US rockets or stages | v · d · eNational Aeronautics and Space Administration (NASA) Policy and history NACA (1915) · National Aeronautics and Space Act (1958) · Paine (1986) · Rogers (1986) · Ride (1987) · Space Exploration Initiative (1989) · Augustine (1990) · U.S. National Space Policy (1996) · CFUSAI (2002) · CAIB (2003) · Vision for Space Exploration (2004) · Aldridge (2004) · Augustine (2009) General: Space Race · Administrators · Chief Scientist · Astronaut Corps · Budget · Technology spin-offs · NASA TV Robotic programs Past Hitchhiker · Mariner · Mariner Mark II · MESUR · Mars Surveyor '98 · New Millennium · Lunar Orbiter · Pioneer · Planetary Observer · Ranger · Surveyor · Viking · Project Prometheus Current Living With a Star · Lunar Precursor Robotic Program · Earth Observing System · Great Observatories program · Explorer · Small explorer · Voyager (unofficial album) · Discovery · New Frontiers · Mars Exploration Rover · Mars Scout Human spaceflight programs Past X-15 (suborbital) · Mercury · Gemini · Apollo · Apollo–Soyuz Test Project (with USSR) · Skylab · Shuttle–Mir (with Russia) · Space Shuttle program · Constellation program Current International Space Station program Future/planned Commercial Orbital Transportation Services (COTS) · Commercial Crew Development (CCDev) Individual featured missions (human and robotic) Past COBE · Magellan · Pioneer 10/11 · Voyager 1/2 · Galileo · WMAP · WISE · Space Shuttle Currently operating MRO · Mars Odyssey · MESSENGER · Dawn · New Horizons · Kepler · International Space Station · Hubble Space Telescope · Spitzer · RHESSI · SWIFT · GALEX · THEMIS · Mars Exploration Rover · Cassini · GOES 14 · Lunar Reconnaissance Orbiter · GOES 15 · SDO · Aquarius  · Juno Future NuSTAR · GRAIL · NPP  · James Webb Space Telescope · MAVEN · EJSM · JDEM · RBSP · MSL · LISA · IXO Space Comm and Nav (SCaN) Space Network · Near Earth Network · Deep Space Network (Goldstone · Madrid · Canberra) NASA categories and lists NASA personnel · NASA programs · NASA probes · NASA images · NASA List of NASA Astronaut Groups · List of astronauts by selection · List of NASA aircraft · List of NASA missions · List of NASA contractors v · d · eReusable launch systems  Partially reusable Current Falcon 9 Planned Falcon Heavy · Falcon 1e · Project 921-3 · Silver Dart Retired Falcon 1* · Space Shuttle · Buran Cancelled Ares I · Ares V · Saturn-Shuttle · Shuttle-C  · Hermes  Completely reusable Current SpaceShipTwo · Boeing X-37 Planned Avatar · Skylon · SpaceShipThree Retired SpaceShipOne · X-15 Cancelled Energia II/Uragan · Falcon 5 · K-1 · VentureStar  · Hopper  · NASP  · HOTOL Italics indicates suborbital launch systems. * - Recovery failed on first three Falcon 1 flights, reusability abandoned thereafter